What was found
DEFERRAL. WHILE ACCOMPLISHED A DETAIL INSPECTION OF THE FUSELAGE SUPPORT, FRAME FOUND A 3 INCH LENGTH CRACK AT BS 1060. ACCOMPLISH THE PERMANENT REPAIR PER EO-98554-REQ1 AND STE-MAE EA 757-5340-27-A4611, REV.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DEFERRAL. WHILE ACCOMPLISHED A DETAIL INSPECTION OF THE FUSELAGE SUPPORT, FRAME FOUND A 3 INCH LENGTH CRACK AT BS 1060. ACCOMPLISH THE PERMANENT REPAIR PER EO-98554-REQ1 AND STE-MAE EA 757-5340-27-A4611, REV.