What was found
MAJOR REPAIR. LT ELEVATOR UPPER SURFACE HAS A PUNCTURE. ACCOMPLISH REPAIR IAW WET LAYUP 200 DEG F (93 DEG C) CURE 757-200PF SRM REV 125 CHAPTER 51-70-17-0G-0 PARAGRAPH 4.A REPAIR GENERAL USING SRM 55-20-01-2R-1 REPAIR 1. PERFORMED MOISTURE REMOVAL CYCLE IAW B757-200PF SRM 51-70-17-0G-0. FILLED AREA IAW B757-200PF SRM 51-70-17-0G-0. USED MATERIALS 04-009-0018 BATCH# 4508204. BONDED REPAIR PLIES IAW B757-200PF SRM 51-70-17-0G-0. USED MATERIALS P/N:04-001-0045 BATCH# 4495866. PERFORMED POST CURE (REPAIR) INSPECTION TO THE REPAIR AREA ON THE UPPER SURFACE OF THE L/H ELEVATOR, IAW B757 NTM 51-00-05 PART 4. THE REPAIR AREA IS DELAMINATION / DISBOND FREE AT THIS TIME.