What was found
DURING PERFORM EO-84432-JIC1, FOUND WEDGE CHANNEL CRACK AT RT STAB BL 421.5. PERFORMED THE HEAT TREATMENT FROM O TO T62 CONDITION. IAW SREO-92949-REQ1, REV 1, STEP 5.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING PERFORM EO-84432-JIC1, FOUND WEDGE CHANNEL CRACK AT RT STAB BL 421.5. PERFORMED THE HEAT TREATMENT FROM O TO T62 CONDITION. IAW SREO-92949-REQ1, REV 1, STEP 5.