What was found
MAIN DECK FLOOR STRUCTURE HAS A CRACK BETWEEN FRAME 73 & 74 AND Y2127 & FUSELAGE (UNDERNEATH). NEW FLOOR STRUCTURE BETWEEN FRAME 73 & 74 AND Y2127 WAS INSTALLED IAW SRM 51-40-21.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAIN DECK FLOOR STRUCTURE HAS A CRACK BETWEEN FRAME 73 & 74 AND Y2127 & FUSELAGE (UNDERNEATH). NEW FLOOR STRUCTURE BETWEEN FRAME 73 & 74 AND Y2127 WAS INSTALLED IAW SRM 51-40-21.