What was found
DURING ROUTINE C CHECK INSPECTION, FOUND ACCESSORY COMPARTMENT FRAME CRACKED AT STATION 255.000 LONGERON 25LT. REMOVED DAMAGED FRAME SEGMENT. FABRICATED NEW SEGMENT. PERFORMED HEAT TREATMENT. CLEANED, TREATED AND PRIMED AREA AND REPAIR PARTS. INSTALLED REPAIR PARTS IAW DC8 SRM 53-2-0 FIGURE 2 SHEET 5 TR 53-125 DATED 8/31/01, SHEET 6 PAGES 5-6, DC8 SRM 51-1-8B, SRM 53-2-0 FIGURE 2 SHEET 1, SRM 53-3-2 FIGURE 3 SHEET 2A ITEM "U", SRM 53-3-2 FIGURE 3 SHEET 2, SRM 51-2-0 FIGURE 52 SHEET 1, SRM 53-2-0 FIGURE 2 SHEET 7-8 TR 53-110 DATED 11-10-00, DC8 SRM 51-1-1 PAGES 1,13,17, SRM 51-1-11, SRM 51-1-20D, AND SRM 51-3-1. (S)