What was found
DURING ROUTINE C-CHECK INSPECTION A CRACK WAS DETECTED AT THE RIGHT FUSELAGE TAIL SECTION BETWEEN STATION 1750.00 AND 1752.00, L14R-L15R. REPAIR ACCOMPLISHED, REMOVED FASTENERS AND DAMAGE AREA IN ACCORDANCE WITH DC8 STRUCTURAL REPAIR MANUAL 53-2-1 FIGURE 7. FABRICATED DOUBLER, FINGER DOUBLER AND FILLER IN ACCORDANCE WITH DC8 STRUCTURAL MANUAL 53-2-1 FIG 7, CLEANED, TREATED AND PRIMED DOUBLER, FINGER DOUBLER AND FILLER. INSTALLED ALL IN ACCORDANCE WITH DC8 STRUCTURAL REPAIR MANUAL 53-2-1 FIG 7, 51-2-20D PAGE 9, AND 51-1-21 PAGE 1.