What was found
DURING ROUTINE C-CHECK INSPECTION FOUND TEMPORARY REPAIR OF FUSELAGE EXTERIOR SKIN STATION 1459.000-1512.000 L-31L TO L-34L. REPAIR ACCOMPLISHED, REMOVED DAMAGED AREA IAW DC8 SRM 53-2-1 PG 107-108 FIG 7. FABRICATED FILLER & DOUBLER & FINGER DOUBLER IAW DC8 SRM 53-2-1 PG 99-100 FIG 7. CLEANED, TREATED AND PRIMED AREA PLUS FILLER, DOUBLER AND FINGER DOUBLER IAW DC8 SRM 51-1-8B. INSTALLED FILLER, DOUBLER AND FINGER DOUBLER IAW DC8 SRM 53-2-1 PG 107-108 FIG 7, SRM 51-1-20D PG 9, AND DC8 SRM 51-1-21.