What was found
DURING ROUTINE C-CHECK INSPECTION RT WING CENTER SECTION UPPER FLOORBEAM FLANGE CORRODED, STA. 980.000 RBL 10 INCHES. REPAIR ARE ACCOMPLISHED, PERFORMED MAJOR REPAIR IAW SRM 51-2-1 FIG. 1, REMOVED CORROSION FROM UPPER FLOORBEAM FLANGE, STA 980.000 RBL. 10 INCHES IAW DC8 SRM 51-1-8 PG. 18, FOUND OUT OF LIMITS IAW SRM 53-2-0 PG. 2M, CUT OUT DAMAGED SECTION, FABRICATED FILLER & DOUBLER IAW SRM 51-2-1 FIG. 1, PERFORMED NDT INSP. IAW NDT SPM PART 08-00-02/07 CLEANED, TREATED AND PRIMED AREA, FILLER, DOUBLER IAW DC8 SRM 51-1-8B INSTALLED FILLER, DOUBLER IAW DC8 SRM 51-2-1 FIG. 7, DC8 SRM 51-1-20D PG. 9, DC8 SRM 51-1-21 PG.7, DC8 SRM 51-3-0 PG. 1.