What was found
DURING A ROUTINE C CHECK FUSELAGE EXTERIOR SKIN WITH 1INCH CRACK AND CORROSION IN IT, STA 1080.000 L-34R. REPAIR WAS ACCOMPLISHED. REMOVED FASTENERS ALONG WITH THE CORROSION. FOUND OUT OF LIMITS IAW SRM 53-2-0 PG 2M. REMOVED THE DAMAGED SECTION IAW DWG V22-R09, PERFORMED NDT INSP INAW DC8 NDT SRM PART 6-10-01-001. FABRICATED FILLER AND DOUBLER IAW DWG V22-R09 CLEANED TREATED AND PRIMED AREA. FILLER DOUBLER IAW DC8 SRM 51-1-8B. APPLIED SEALANT TO FAYING SURFACES IAW DC8 SRM 51-1-11 PG 9. INSTALLED FILLER, DOUBLER & NEW FASTENERS IAW SRM 51-1-20D, SRM 51-1-21 PG 7.