What was found
DURING A ROUTINE C-CHECK INSPECTION FOUND CORROSION ON RT OUTER WING IB L/E OUTER PLATING AROUND STA XFS 710.00. REPAIR WAS ACCOMPLISHED. REMOVED FASTENERS IAW SRM 51-1-20D PG 21, 51-1-21 PG. 1,51-3-0 PG 1. THE CORROSION AND DAMAGED SKIN WAS REMOVED AND FOUND OUT OF LIMITS. IAW DWG V22-R03 AND SRM 57-2-1 PG. 11. NDT INSPECTION WAS PERFORMED PER NDT SPM PART 6-10-01.001. CLEANED, TREATED AND PRIMED AREA, FABRICATED A REPAIR DOUBLER AND FILLER IAW DWG. V22-R03. THE REPAIR DOUBLER WAS CLEANED, TREATED AND PRIMED. PRC SEALANT WAS APLIED ON FAYING SURFACES IAW SRM 51-1-11 PG.9. INSTALLED DOUBLER AND FILLER USING NEW FASTENERS IAW DWG V22-R03 AND SRM 51-1-20D PG 9, 51-1-21 PG. 1 AND 51-3-0 PG. 1..