What was found
DURING ROUTINE C CHECK INSPECTION FOUND RT INNER WING CTR. LE SLOT OUTER PLATING CORRODED. STA.XW257.000-XFS 310.250. REPAIR WAS ACCOMPLISHED. FASTENERS AND CORROSION WERE REMOVED ALONG WITH THE DAMAGED AREA AND FOUND OUT OF LIMITS IAW DC8 SRM 51-1-21 PG. 1, 51-3-0 PG.1, 51-1-20D PG. 9, 51-1-8 PG.17-18, 57-2-1 PG. 11 AND DWG V22-R14. NDT INSPECTION WAS PERFORMED IAW NDT SPM PART 6-10-01-001. FABRICATED DOUBLER & 2 FILLERS IAW DC8 DRM 51-1-8B. APPLIED PRC SEALANT TO FAYING SURFACES IAW DC8 SRM 51-1-11 PG. 9. INSTALLED DOUBLER & FILLERS AND NEW FASTENERS IAW DWG V22-R14, DC8 SRM 51-1-21 PG 1, 51-3-0 PG. 1 51-1-20D PG. 9.