What was found
ROUTINE C-CHECK INSP FOUND RT IB VANE SLOT ELONGATED HOLES AT STA XS. 250.089. REPAIR WAS ACCOMPLISHED. REMOVED ALL FASTENERS WITHIN REPAIR AREAS IAW SRM 51-1-21 PG 1, SRM 51-1-20D PG 21. REMOVED DAMAGED AREA IAW DWG V82-R07. PERFORMED NDT INSP IAW NDT SPM PART 06-10-01-001. CLEANED, TREATED AND PRIMED AREA IAW SRM 51-1-8B. FABRICATED AN EXTERNAL DOUBLER AND FILLER AND INTERNAL DOUBLER IAW DWG VR2-R07. CLEANED, TREATED AND PRIMED REPAIR DOUBLER INTERIOR SURFACE, FILLER AND INTERNAL DOUBLER IAW SRM 51-1-8B. APPLIED SEALANT ON FAYING SURFACES IAW SRM 51-1-11 PG1. INSTALLED EXTERNAL DOUBLER, FILLER AND INTERNAL DOUBLER ON RT IB VANE SLOT USING NEW FASTENERS IAW DWG V82-R07, SRM 51-1-21 PG.1, SRM 51-1-20D PG7.