What was found
DURING ROUTINE C CHECK INSPECTION, FOUND FWD FUSELAGE (02 EA) INTERIM REPAIRS ON EXHAUST DOOR SYSTEM CORNERS AT STA 40,000 L-31L. REPAIRS WERE ACCOMPLISHED BY PERFORMING THE FOLLOWING REPAIRS IAW DC8 SRM 53-2-0 FIG 13. REMOVED INTERIM REPAIR IAW DC8 SRM 51-1-20D PAGE 21. FABRICATED DOUBLER IAW DC8 SRM 53-2-0 PAGES 69 AND 70 FIG 13. CLEANED, TREATED AND PRIMED AREA AND DOUBLER IAW DC8 SRM 51-1-8B. APPLIED PRC SEALANT ON FAYING SURFACES IAW DC8 SRM 51-1-15 PAGE 1. INSTALLED DOUBLER WITH NEW FASTENERS IAW DC8 SRM 53-2-0 PAGES 69 AND 70, DC8 SRM 51-1-20D PAGE 9.