What was found
DURING A ROUTINE C CHECK INSPECTION, FOUND FWD FUSELAGE EXTERNAL AC POWER RECEPTACLE EXTERNAL SKIN HAS INTERIM REPAIR AT FS 32.000, L-31R TO L-32R. REPAIRS WERE ACCOMPLISHED BY PERFORMING THE FOLLOWING REPAIR IAW DC8 SRM 51-1-21 PAGES 1, 2. REMOVED DAMAGED AREA IAW DC8 SRM 53-2-0 PAGES 2K FIG 10. FABRICATED FILLER AND DOUBLER IAW DC8 SRM 53-2-0 PAGE 2K FIG 10. CLEANED, TREATED AND PRIMED FILLER AND DOUBLER IAW DC8 SRM 51-1-8B. INSTALLED FILLER AND DOUBLER IAW DC8 SRM 51-1-20D PAGE 9, SRM 51-1-21 PAGE 1.