What was found
DURING A ROUTINE C CHECK INSPECTION, LT FUSELAGE FORWARD PASSENGER DOOR UPPER FORWARD JAMB CORNER INTERIM REPAIR AROUND STA 25.000, L-8L TO L-10L. REPAIR ACCOMPLISHED, REMOVED INTERIM REPAIR, FABRICATED DOUBLER AND TRIPLER. CLEANED, TREATED AND PRIMED AREA. APPLIED PRC SEALANT ON FAYING SURFACES. INSTALLED DOUBLER AND TRIPLER WITH NEW FASTENERS PER DOUGLAS STRUCTURAL REPAIR MANUAL AND DRAWINGS DACO SR 08530021 AND 5750776.