What was found
DURING A ROUTINE C CHECK INSPECTION, TEE CRACK DAMAGE WAS FOUND RT FUSELAGE STRUCTURE MLG COMPARTMENT AROUND STA 960.000. REPAIR ACCOMPLISHED REMOVAL OF DAMAGED SECTION. FABRICATED TEE ANGLE, HEAT TREATED AND PERFORMED NDT INSPECTION. FABRICATED SPLICES. APPLIED PRC SEALANT TO FAYING SURFACES. CLEANED, TREATED AND PRIMED SPLICE AND TEE ANGLE. INSTALLED SPLICES AND TEE ANGLE PER DOUGLAS STRUCTURAL REPAIR AND ATI REPAIR SPECIFICATION NR 2003-05, DPS 7.00-1.