What was found
DURING A ROUTINE C CHECK, RT FUSELAGE WELL MLG WEB CRACK DAMAGE BETWEEN STA Y=857.125 AND XCW=25.000. REPAIR ACCOMPLISHED, REMOVED FASTENERS, REMOVED WEB DAMAGED SEGMENT. PERFORMED NDT INSPECTION. FABRICATED NEW WEB SEGEMENT AND EXTERNAL REPAIR DOUBLER AND INTERNAL REPAIR DOUBLER. CLEANED, TREATED AND PRIMED REPAIR PARTS. APPLIED PRC SEALANT TO FAYING SURFACES INSTALLED NEW WEB SEGMENT AND INTERNAL/EXTERNAL REPAIR DOUBLER WITH NEW FASTENERS PER DOUGLAS STRUCTURAL REPAIR MANUAL AND DRAWING W43-R01