What was found
DURING A ROUTINE C CHECK INSPECTION, RT WING INBD FLAP UPPER SKIN HAS INTERIM REPAIR BETWEEN STATION XW63.00-XW91.000. MAJOR REPAIR WAS ACCOMPLISHED BY REMOVED THE UPPER PLATING WITH INTERIM REPAIR. FABRICATED NEW PLATING PANEL, CLEANED, TREATED AND PRIMED AREA + NEW PLATING PANEL INTERNAL PART APPLIED SEALANT TO FAYING SURFACES. INSTALLED NEW PLATING PANEL IN ACCORDANCE WITH DC8 SRM 51-1-8B, FAA FORM 8110 NR 04571, DWG SEMAN EO 3375-1, SRM 51-1-11 AND 51-1-21 AND 51-3-0.