What was found
DURING A ROUTINE C CHECK INSPECTION, FOUND RT FUSELAGE FORWARD ACCESSORY COMPARTMENT STRUCTURE FRAME CRACK DAMAGE AT STA FS 55.00,L-24R. MAJOR REPAIR ACCOMPLISHED REMOVAL OF FASTENERS FROM REPAIR AREA. REMOVED DAMAGED FRAME SEGMENT. PERFORMED NDT INSPECTION. FABRICATED FRAME SEGMENT AND SPLICE DOUBLER. PERFORMED HEAT TREATMENT, CLEANED, TREATED AND PRIMED AREA AND REPAIRED PARTS. APPLIED SEALANT TO FAYING SURFACES. INSTALLED FRAME SEGMENT AND SPLICES IAW DC8 SRSM 53-2-0 FGI2 SH 1, 6 TR NR 53-125, 53-3-1 FIG 3 SH 2, 2A, 51-1-1, 51-1-4, 51-1-11, 51-1-15, 51-1-20D, 51-3-1, 51-3-2 DPS 3.69-4 REV "AM" R-1,7.00-1 REFV."BK".