What was found
DURING ROUTINE C CHECK INSPECTION, LH INBD FLAP UPPER PART SKIN NON STANDARD REPAIR, XW 132.000. PERFORMED MAJOR REPAIR IAW DC-8 SRM 57-1-0 PAGE 1, DC-8 SRM 57-7-1 FIG. 1, EO SEMAN NR 2005851 DATE 06-18-05. REMOVED PLATING WITH IMPROPER REPAIR IAW DC-8 SRM 51-1-21 PAGE 1. FABRICATED NEW PLATING (ALCLAD 2024 T3 0.050”) IAW DC-8 SRM 57-7-1 FIG. 1 ITEM “F”. CLEANED, TREATED AND PRIMED AREA + NEW PLATING INTERNAL PART IAW DC-8 SRM 51-1-8B. APPLIED PRC SEALANT TO FAYING SURFACES IAW DC-8 SRM 51-1-11 PAGE 9. INSTALLED NEW PLATING IAW DC-8 SRM 51-1-21 PAGE 1.