What was found
DURING ROUTINE C CHECK INSPECTION, RT IB FLAP FWD UPPER PLATING NON STANDARD REPAIRS (02 EA ) STA XW 84.00 -XW 91.00. PERFORMED MAJOR REPAIR IAW NR 05258 DATE 06-24-05, DWG ED 4004, EO NR 2005911 DATE 06-24-05. REMOVED FASTENERS IAW SRM. REMOVED PLATING SEGMENT (DAMAGED) IAW DWG NR ED 4004, PERFORMED NDT INSPECTION. IAW NDT SPM PART. NO CRACK, NO CORROSION FOUND. FABRICATED NEW PLATING SEGMENT (ALCLAD 2024 T3 0.040”) + INTERNAL SPLICE (ALCLAD 2024 T3 0.050) + EXTERNAL DOUBLERS (02 EA) (ALCLAD 2024 T3 0.050) IAW DWG ED 4004, SRM. CLEANED, TREATED AND PRIMED AREA AND REPAIR PARTS INTERNAL PART IAW SRM. APPLIED PRC SEALANT TO FAYING SURFACES IAW SRM. INSTALLED REPAIR PARTS AND TORQUED IAW SRM.