What was found
DURING ROUTINE C CHECK INSPECTION, LT WING IB L/E UPPER SURFACE BROKEN, STA XFS 51.250 - 57.500. PERFORMED MAJOR REPAIR IAW SRM 57-2-1 FIG. 25, EO SEMAN NR 2005908 DATE 06-15-05. REMOVED DAMAGED AREA IAW SRM 57-2-1 FIG. 21. PERFORMED NDT INSPECTION IAW NDT SPM PART 06-10-01-001. FABRICATED INTERNAL REPAIR DOUBLER (ALCLAD 2024 T3 0.090”) + FILLER (ALCLAD 2024 T3 0.063”) IAW SRM 57-2-1 FIG. 21. CLEANED, TREATED AND PRIMED AREA + REPAIR PARTS INTERNAL PART IAW SRM 51-1-8B. APPLIED PRC SEALANT TO FAYING SURFACES IAW SRM 51-1-12. INSTALLED REPAIR PARTS IAW SRM 57-2-1 PAGE 21, SRM 51-1-21 PAGE 1.