What was found
DURING ROUTINE C CHECK INSPECTION, LH INBD FLAP UPPER PART DENTED, XW 131.000 PERFORMED MAJOR REPAIR IAW DC-8 SRM 57-1-0 PAGE 1, DC-8 SRM 57-7-1 FIG. 1, EO SEMAN Nº 20051010 DATE 06-28-05. REMOVED DAMAGED PLATING IAW DC-8 SRM 51-1-21 PAGE 1. FABRICATED NEW PLATING (ALCLAD 2024 T3 0.025”) + BONDED DOUBLER (ALCLAD 2024 T3 0.020”) IAW DC-8 SRM 57-7-1 FIG. 1 ITEM “A”, “L”. CLEANED, TREATED AND PRIMED AREA + REPAIR PARTS INTERNAL PART IAW DC-8 SRM 51-1-8B. APPLIED PRC SEALANT TO FAYING SURFACES IAW DC-8 SRM 51-1-11 PAGE 9 BONDED DOUBLER. IAW DC-8 SRM 51-1-9 (HYSOL). INSTALLED NEW PANEL IAW DC-8 SRM 51-1-21 PAGE 1.