What was found
DURING ROUTINE C-CHECK INSPECTION, RH. INBD. FLAP.- FWD UPPER PLATING HAS INTERIN REPAIR, XF 134.000. PERFORMED MAJOR REPAIR IAW DC-8 SRM 57-1-0 PAGE 1, DC-8 SRM 57-7-1 FIG. 1, EO SEMAN 20051009 DATE 06-28-05. REMOVED PLATING WITH INTERIM REPAIR IAW DC-8 SRM 51-1-21 PAGE 1. FABRICATED NEW PLATING (ALCLAD 2024 T3 0.050”) IAW DC-8 SRM 57-7-1 FIG. 1 ITEM F. CLEANED, TREATED AND PRIMED AREA AND NEW PLATING INTERNAL PART IAW DC-8 SRM 51-1-8B. APPLIED PRC SEALANT TO FAYING SURFACES IAW DC-8 SRM 51-1-11 PAGE 9. INSTALLED NEW PLATING IAW DC-8 SRM 51-1-21 PAGE 1.