What was found
DURING ROUTINE C CHECK INSPECTION, EXTERNAL FUS. (C) BELLY PIT DOOR SKIN SCRATCHES OUT OF LIMITS. PERFORMED MAJOR REPAIR, REMOVED FASTENERS IAW SRM 51-1-20D. REMOVED DAMAGED SECTION IAW DWG NR ED-4075. NDT INSPECTED IAW NDT SPM PART 06-10-01-001. NEITHER CRACK NOR CORROSION FOUND. FABRICATED REPAIR DOUBLER (AL7075T6 0.190”) + FILLER PLUG (AL7075T6 0.250”) IAW DWG NR ED-4075. TAPERED REPAIR DOUBLER FROM 0.190 TO 0.08 IAW DWG ED-4075. CLEANED, TREATED, PRIMED AREA + REPAIR PARTS IAW SRM 51-1-8B. APPLIED SEALANT TO FAYING SURFACES IAW SRM 51-1-11 PG 9. INSTALLED REPAIR PARTS IAW DWG NR ED-4075, SRM 51-1-20D, SRM 51-3-0, SRM 51-3-1 (TORQUE) FOR FUEL LEAK CK.