What was found
DURING C CHECK INSPECT, EXTERNAL FS REPAIR FASTENERS IMPROPER AND RIVETS EXCEED ALLOWABLE LIMITS, STA 180.000 L-19R. PERFORMED MAJOR REPAIR IAW DC8 SRM 53-2-1 FIG 7, EO SEMAN 20051309 DATED 09-29-05. REMOVED EXISTING REPAIR DOUBLER IAW DC8 SRM 51-1-21, DC8 SRM 51-1-20D. REMOVED DAMAGED SECTION IAW DC8 SRM 53-2-1 FIG 7 (SHEET 1, 3). NDT INSPECTED REWORKED AREA IAW DC8 NDT SPM PART 06-10-01-001. NEITHER CRACK NOR CORROSION FOUND. FAB`D REPAIR DOUBLER (AL7075T6 0.071) + (04EA) INTERNAL FINGER DOUBLERS (AL7075T6 0.040”) IAW DC8 SRM 53-2-1 FIG 7 (SHEET 1, 3), DC8 SRM 53-4-1 FIG 6 ITEM “A”, DC8 SRM 51-9-0 FIG 68A, DC8 SRM 51-1-4 PG 1 (FORMING). CLEANED, TREATED, PRIMED AREA AND REPAIR PARTS IAW DC8 SRM 51-1-8