What was found
DURING C CHECK INSPECT, UAL DRAIN DOUBLER ON FWD LOWER FUSELAGE, STA FS 224.000, L-35.75R REPAIR MUST BE UPGRADED. PERFORMED MAJOR REPAIR IAW FAA FORM 8110-3 NR 05258 DATE 06-24-05, SEMAN DWG ED 3994 DATE 06-22-05, EO SEMAN NR 2005832 DATE 06-24-05. REMOVED EXISTING REPAIR DOUBLER IAW DC-8 SRM 51-1-21 PAGE 1, DC-8 SRM 51-1-20D PAGE 21. FABRICATED REPAIR DOUBLER (ALCLAD 7075 T6 0.080”) + (02 EA) INTERNAL FINGER DOUBLER (ALCLAD 7075 T6 0.032”) IAW SEMAN ED 3994 AND DC-8 SRM 51-1-4 PAGE 1. CLEANED, TREATED AND PRIMED AREA + REPAIR PARTS IAW DC-8 SRM 51-1-8B. APPLIED PRC SEALANT TO FAYING SURFACES IAW DC-8 SRM 51-1-11. INSTALLED REPAIR PARTS IAW SEMAN DWG ED 3994, DC-8 SRM 51-1-21 PAGE 1, DC-8 SRM 51-1-20D PAGE