What was found
DURING ROUTINE C CHECK INSPECTION, EXTERNAL DOUBLER ON FWD FUSELAGE BELLY SKIN, MUST BE UPGRADED, REPAIR MUST HAVE THREE ROWS OF RIVETS AT STA FS 1135.000 L-35.5R. PERFORMED MAJOR REPAIR IAW DC-8 SRM 53-2-1 FIG 7 EO SEMAN Nº 2005870 DATE 06-13-05. REMOVED EXISTING REPAIR DOUBLER IAW DC-8 SRM 51-1-21 PAGE 1. REMOVED DAMAGED AREA IAW DC-8 SRM 53-2-1 FIG. 7 (SHEET 1,3). FABRICATED REPAIR DOUBLER (ALCLAD 7075 T6 0.160”) + (02 EA) INTERNAL FINGER DOUBLER (ALCLAD 7075 T6 0.050”) IAW DC-8 SRM 53-2-1 FIG 7 SHEET 1, 3, DC-8 SRM 53-4-1 FIG 16 SHEET 1, ITEM D, DC-8 SRM 51-1-4 PAGE 1. CLEANED, TREATED AND PRIMED AREA + REPAIR PARTS IAW DC-8 SRM 51-1-8B. APPLIED PRC SEALANT TO FAYING SURFACES IAW DC-8 SRM 51-1-11. INSTA