What was found
DURING ROUTINE C CHECK INSPECTION, RT WING INBD L/E UPPER SKIN NON STANDARD REPAIR BETWEEN STA XFS 113.750 - XF 120.000. PERFORMED MAJOR REPAIR IAW DC-8 SRM 57-2-1 FIG. 2J, EO SEMAN NR 2005970 DATE 06-23-05. REMOVED DAMAGED PLATING IAW DC-8 SRM 57-2-1 FIG. 2J. PERFORMED NDT INSPECTION IAW DC-8 NDT SPM PART 06-10-01-001. FABRICATED INTERNAL REPAIR DOUBLER (ALCLAD 2024 T3 0.090”) + FILLERS (ALCLAD 2024 T3 0.063”) IAW DC-8 SRM 57-2-1 FIG. 2J. CLEANED, TREATED AND PRIMED AREA + REPAIR PARTS INTERNAL PART IAW DC-8 SRM 51-1-8B. APPLIED PRC SEALANT TO FAYING SURFACES IAW DC-8 SRM 51-1-12 PAGE 9. INSTALLED REPAIR PARTS IAW DC-8 SRM 57-2-1 FIG. 2J, DC-8 SRM 51-1-21 PAGE 1.