What was found
DURING ROUTINE C CHECK, FOUND KEEL BEAM ATTACH ANGLE CRACKED AT HINGE FASTENER HOLE. REMOVED DAMAGED ANGLE, FABRICATED NEW ANGLE, LOCATED, DRILLED, TRIMMED, TREATED, PRIMED, AND INSTALLED NEW ANGLE. IAW DC8 SRM 51-1-20D, 51-1-8, AND DOUGLAS DRAWING 5616306.