What was found
DURING ROUTINE C-CHECK INSPECTION, DENT ON LWR SURFACE RT OUTBOARD FLAP STA XW 404.000 - 406.000. PERFORMED MAJOR REPAIR IAW DC8 SRM 57-2-5 FIG 2 (SHEET 2), TR 57-91 DATED 09-30-01. REMOVED FASTENERS IAW DC8 SRM 51-1-21. REMOVED DAMAGED AREA. FABRICATED REPAIR DOUBLER (AL 2024 T3 0.050) IAW DC8 SRM 57-2-5 FIG 2 (SHEET 2), DC-8 SRM 57-7-1 FIG 4 ITEM P, Q. CLEANED, TREATED, PRIMED AREA REPAIR DOUBLER INTERNAL PARTS IAW DC-8 SRM 51-1-8B. APPLIED SEALANT TO FAYING SURFACES IAW DC8 SRM 51-1-11. INSTALLED REPAIR PARTS IAW DC8 SRM 57-2-5 FIG 2 (SHEET 2, 4), DC8 SRM 51-1-9A (HYSOL), DC8 SRM 51-1-21.