What was found
DURING ROUTINE C-CHECK INSPECTION, EXTERNAL FUS FREON AFT + FWD LWR CORNER EXTERNAL IS NOT IAW SRM, STA 45.000 L-30L. PERFORMED MAJOR REPAIR IAW DC8 SRM 53-2-0 FIG 13. REMOVED NON STANDARD REPAIR IAW DC8 SRM 51-1-20D, DC-8 SRM 51-3-0. REMOVED DAMAGED AREA IAW DC8 SRM 53-2-0 FIG 13 (SHEET 1). FABRICATED REPAIR DOUBLER (AL 2024 T3 0.071) + FILLER (AL 2024 T3 0.063) IAW DC8 SRM 53-2-0 FIG 13 (SHEET 1, 5) DC-8 SRM 53-2-0 FIG 13 T/R 53-169. CLEANED, TREATED, PRIMED AREA + REPAIR PARTS IAW DC8 SRM 51-1-8B. APPLIED SEALANT TO FAYING SURFACES IAW DC8 SRM 51-1-11. INSTALLED REPAIR PARTS IAW DC8 SRM 53-2-0 FIG 13 (SHEET 1, 5) DC8 SRM 51-3-0, DC8 SRM 51-1-20D, DC-8 SRM 51-3-1 (TORQUE).