What was found
DURING ROUTINE C-CHECK INSPECTION, NR 1 PYLON LT UPPER PART PANEL CRACKED 2 INCHES, YN 321.000. PERFORMED MAJOR REPAIR IAW DC8-70 SB 54-93 CONDITION V. REMOVED FASTENERS IAW SB 54-93 PAGE 11 FIG 2 DC8 SRM 51-3-0, DC8 SRM 51-1-21. PERFORMED VISUAL INSPECTION TO PYLON ADAPTER PANEL FOR CRACK, BREAKS OR MISALIGNED BOLTS. NEITHER CRACKS, BREAKS, CORROSION NOR MISALIGNED BOLTS. PERFORMED STOP HOLE ON CRACK END AND FABRICATED (04EA) DOUBLERS (AL7075T6 0.090) IAW SB 54-93 PAGES 8, 9, 10. CLEANED, TREATED AND PRIMED AREA + REPAIR PARTS IAW DC8 SRM 51-1-8B. APPLIED SEALANT TO FAYING SURFACES IAW DC8 SRM 51-1-11. INSTALLED REPAIR PARTS.