What was found
DURING ROUTINE C-CHECK INSPECTION, LT ELEVATOR UPPER SURFACE HAS NON - STANDARD REPAIR AT STA XE 99.281. PERFORMED MAJOR REPAIR IAW DC8 SRM 55-4-1 FIG 1. REMOVED PANEL PLATING WITH STANDARD REPAIR IAW DC8 SRM 55-1-0, DC8 SRM 51-1-21. FABRICATED NEW PLATING + BONDED FINGER DOUBLER IAW DC8 SRM 55-4-1 FIG 1. BONDED BOTH PARTS WITH HYSOL IAW DC8 SRM 51-1-9, DC8 SRM 51-1-9A. CLEANED, TREATED AND PRIMED AREA + NEW PANEL PLATING IAW DC8 SRM 51-1-8B. APPLIED SEALANT TO FAYING SURFACES IAW DC8 SRM 51-1-11. INSTALLED NEW PANEL PLATING IAW DC8 SRM 51-1-21, DC8 SRM 51-3-0, 51-3-1. PERFORMED BALANCE TO LT ELEVATOR IAW DC8 SRM 51-4-4 FOUND WITHIN LIMITS TABLE MOMENT 1.449. 37 IN LBS.