What was found
DURING ROUTINE C CHECK INSPECTION FOUND RIGHT HAND OUTBOARD FLAP LOWER SKIN DENTED AT STATION XF 440.000. PERFORMED MAJOR REPAIR IAW DC-8 SRM 57-7-1 FIG 4 TEMPORARY REVISION NUMBER 57-94 DATED 10-01-02. REMOVED DAMAGE IAW DC-8 SRM 57-1-0 PAGE 1, DC-8 SRM 51-1-21. FABRICATED NEW SKIN AND DOUBLER IAW DC-8 SRM 57-7-1 FIG 4 ITEM U AND Q BONDED BOTH PARTS WITH HYSOL IAW DC-8 SRM 51-1-9. CLEANED, TREATED AND PRIMED AREA AND NEW PANEL PLATING INTERNAL PART IAW DC-8 SRM 51-1-8B. APPLIED SEALANT TO FAYING SURFACES IAW DC-8 SRM 51-1-11. INSTALLED NEW SKIN AND DOUBLER IAW DC-8 SRM 51-1-21.