What was found
DURING ROUTINE C CHECK INSPECTION, RUDDER LEFT HAND CAP CORRODED AT HINGE SUPPORT AT STATION ZR 103.000. PERFORMED MAJOR REPAIR IAW DC-8 SRM 55-6-1 FIGURE 2, SHEET 1, AND 3, DOUGLAS DRAWING 5655068. REMOVED CORROSION IAW DC8 SRM 51-1-8 PAGES 17, 18. FOUND OUT OF LIMITS IAW DC8 SRM 55-2-0 PAGE 12. REMOVED CORRODED SPAR CAP IAW DC-8 SRM 51-1-21, DC-8 SRM 55-1-0, DC8 SRM 51-3-0, DC8 SRM 51-1-20D. CLEANED, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8B. APPLIED SEALANT TO FAYING SURFACES IAW DC8 SRM 51-1-11. INSTALLED NEW SPAR CAP, IAW DC8 SRM 51-1-2L, DC8 SRM 51-3-0, DC8 SRM 51-1-20D, DC8 SRM 51-3-1. PERFORMED REBALANCE TO RUDDER IAW DC8 SRM 51-4-6. FOUND WITHIN TOLERANCE LIMITS. MOMENT 2540 14 IN LBS.