What was found
DURING ROUTINE C CHECK INSPECTION FOUND RUDDER LEADING EDGE LEFT HAND SKIN WITH NON STANDARD REPAIR AT STATION ZR 96.000. PERFORMED MAJOR REPAIR IAW DC-8 SRM 55-6-1 FIGURE 1. REMOVED EXISTING SKIN WITH NON STANDARD REPAIR IAW DC-8 SRM 51-1-21, DC-8 SRM 55-1-0 PAGE 1. FABRICATED NEW SKIN WITH AL2024T3 0.050 IAW DC-8 SRM 55-6-1 FIGURE 1 ITEM G. CLEANED, TREATED AND PRIMED AREA, AND NEW SKIN IAW DC-8 SRM 51-1-8B. APPLIED SEALANT TO FAYING SURFACE IAW DC8 SRM 51-1-11. INSTALLED NEW SKIN IAW DC-8 SRM 51-1-12.