What was found
DURING ROUTINE C CHECK INSPECTION, FOUND EXISTING REPAIR FROM STATION 1240 TO 1280 LONGERON 32 RIGHT TO LONGERON 35 RIGHT IS NOT IN COMPLIANCE WITH AD.2005-18-07 OR SB DC8-53-078. REMOVED EXISTING REPAIR. MANUFACTURED REPAIR PARTS. CLEANED, TREATED AND PRIMED AREA AND REPAIR PARTS. APPLIED SEALANT TO FAYING SURFACES. INSTALLED NEW REPAIR PARTS IAW DC8 SRM 53-4-1 FIG 16, DC8 SRM 51-1-21, DC8 SRM 51-1-20D, DC8 SRM 51-3-1, DC8 SRM 53-4-1 FIG 18B SHEET 2 PAGE 44C-44D, DC8 SRM 53-1-0 PAGE 1 AND DC8 SRM 51-1-8B.