What was found
DURING ROUTINE C CHECK INSPECTION, FOUND MAIN CARGO COMPARTMENT HAS A IMPROPER REPAIR AND DENT ON FRAME AT STATION 240.000 LONGERON 20 RIGHT. REMOVED FASTENER AS NEEDED TO PERFORM REPAIR. REMOVED EXISTING REPAIR. FABRICATED FRAME SEGMENT, SPLICE AND ANGLE. PERFORMED HEAT TREATMENT TO FRAME SEGMENT, SPLICE AND ANGLE. CLEANED, TREATED AND PRIMED AREA AND REPAIR PARTS. INSTALLED REPAIR PARTS AND NEW FASTENERS IAW 51-1-11, 51-3-1, DC8 SRM 53-2-0 FIGURE 2 SHEET 2 AND 6, DC8 SRM 51-1-20D, DC8 SRM 53-4-1 FIGURE 40 SHEET 7-9 ITEM "C", SRM 53-2-0 FIGURE 2 SHEET 1, SRM 51-2-0 FIGURE 50 SHEET 49A, DC8 SRM 53-2-0 FIGURE 2 SHEET 8 T/R 53-110 DATED 11-10-2000, SRM 53-2-0 FIGURE 2 SHEET 7 T/R 53-110 DATED 11-10-2000, DC8 SRM 51-1-1 PAGES 1, 13, 17, AND DC8 SRM 51-1-8B.