What was found
DURING ROUTINE C CHECK INSPECTION FOUND MAIN CARGO COMPARTMENT SUB FLOOR FITTING CRACKED AT STATION 798.000 LBL 24". REMOVED CRACKED FITTING. CLEANED, TREATED, AND PRIMED AREA AND FITTING. INSTALLED NEW FITTING IAW DC8 SRM 51-1-20D, SRM 51-3-0, DC8 SRM 51-1-8B, 51-3-0, SRM 51-3-1, ATI REPAIR SPECIFICATION NUMBER 2003-05, AND SEMAN-FORM-07 IPI NUMBER 2009628.