What was found
DURING C19 CHECK INSPECTION RT FUSELAGE - SECTION 48 - BODY STATION 1809.5 BULKHEAD FWD OUTER CHORD CRACK DAMAGE AT STA 1809.5. PERFORMED MAJOR REPAIR IAW SB 767-53A0078. REMOVED ALL ACCESS DOORS AND ALL FASTENERS FROM REPAIRED AREA IAW SB 767-53A0078 METHOD 2 AND SRM 51-40-02. FABRICATED FILLERS AND PLATES IAW S/B 767-53A0078 PAGE 58 SHEET 6. PERFORMED CRACK END STOP DRILL IAW SRM 51-10-00. CLEANED, TREATED AND PRIMED AREA, FILLERS AND PLATES IAW SRM 51-20-01. INSTALLED REPAIRED PARTS IAW SB 767-53A0078 IAW SRM 51-40-02 AND SRM 51-20-05 AND EO 2012040.