As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
(CONTROL NR JAS-SDR-OO1) FLUCTION OF HYDRAULIC PRESSURE. DEFECTIVE/DAMAGED PN MS28778-6 PACKING. FLIGHT CREW COMPLETED ABNORMAL CHECKLIST. UPON INSPECTION, FOUND THAT PACKING AT HYDRAULIC PUMP PRESSURE OUTLET FITTING HAD FAILED. THIS COMPONENT WAS WORKED ON IAW COMMUNIQUE 280, ON JULY 9, 2007. AFT 49.9 HRS 68 CYCLES