What was found
REPAIRED 22 CORRODED AREAS OF THE DROPPED AISLE FLOOR (INTERIOR FUSELAGE SKIN) BY BLENDING AREAS, PERFORMING ULTRASONIC AND EDDY CURRENT INSPECTIONS, TREATING, PRIMING, AND INSTALLING REPAIR DOUBLERS AS REQUIRED IAW ENGINEERING REPAIR ORDER ERO-936469 REV IR, APPROVED BY FAA FORM 8110-3 DATED 18 FEB 2019.