What was found
FOUND LEVEL 1 CORROSION IN THE LT WHEEL WELL CENTER SPAR #2 RIB DURING THE MLG CORROSION ZONAL INSPECTION. BLENDED CORROSION IN LT WHEEL WELL ON CENTER SPAR #2 RIB. FOUND CORROSION TO BE BEYOND CORROSION LIMITATIONS IAW SRM 51-70-02. REPAIRED CORROSION PER ENGINEERING MEMO DQ# 22016 M1 DATED 06/26/19. NDT PERFORMED EDDY CURRENT AND ULTRASONIC THICKNESS INSPECTIONS AFTER CORROSION WAS REMOVED FROM THE LT WHEEL WELL CENTER SPAR #2 RIB. INSPECTIONS REVEALED NO CRACK OR CORROSION INDICATIONS, THICKNESS READINGS AS DOCUMENTED FOR FURTHER EVALUATION.