What was found
REPAIRED THE FORWARD SPAR OF THE VERTICAL STABILIZER BY MECHANICALLY BLENDING CORRODED AREAS, PERFORMING NDT, AND REPORTING FOR REPAIR DISPOSITION. CLEANED, TREATED, AND PRIMED AREAS FOUND ACCEPTABLE. FABRICATED AND INSTALLED REPAIR DOUBLER, REPAIR SHIM, AND REPAIR CLIPS IN ACCORDANCE WITH TEXTRON FIELD REPAIR.