What was found
NUMBER 1 ENG UN-COMMANDED FEATHER ON CLIMB. R & R PROPELLER ASSEMBLY, OPERATIONS CHECK & LEAK CHECK SATISFACTORY.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NUMBER 1 ENG UN-COMMANDED FEATHER ON CLIMB. R & R PROPELLER ASSEMBLY, OPERATIONS CHECK & LEAK CHECK SATISFACTORY.