Service difficulty report · Tire · Emb EMB145XR

Difficulty date
December 1, 2017
Submitted
December 4, 2017
Operation
Air carrier
Aircraft
N11176
Make and model
Emb EMB145XR
Aircraft serial
14500881
Aircraft time
33,375 hours, 20,876 cycles
System (JASC)
3244 · Tire
Part
Tire
Condition
Failed
Location
Mlg
Stage of operation
TO
How discovered
O
Nature of condition
E
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

#3 TIRE BLOWOUT DURING TAKEOFF ROTATION. R&R #3 AND #4 MAIN WHEEL ASSY IAW EMB 145 AMM 32-49-02. OPSAND LEAK CHECKS OF BRAKE SYSTEM SAT. ADDED EVENT INSPECTIONS AND DAMAGE. DAMAGE TO #2 ENGINE INLET GUIDE VANES DUE TO #3 TIRE BLOWOUT - FURTHER INSP REQUIRED. R&&R DAMAGED FAN BYPASS VANES IAW RR MM 72-25-10. OPS CHECK SAT IAW RR MM 71-00-00. LEADING EDGE OF RIGHT FLAP DAMAGED DUE TO #3 TIRE BLOWOUT. COMPLIED WITH STS EA 25-2017-140. ACCEPTABLE FOR ONE NON REV FERR FLIGHT FROM ROC TO ALB. FLIGHT TO BE CONDUCTED AT A SUITABLE REDUCED SPEED AT THE CAPTAINS DISCRETION. RIGHT INBD FLAP REQUIRES PERMANENT REPAIR. LANDING GEAR TREAD FAILURE INSPECTION. COMPLIED WITH THREAD FAILURE INSPECTIONS IAW EMB 145 AMM 05-50-15. ALL DISCREPANCIES NOTED.