What was found
RIGHT LEADING EDGE WAS DEEPLY GOUGED BETWEEN RIBS 1 & 2. APPROXIMATELY 4 INCHES ABOVE LANDING LIGHT CUT-OUT. INSTALLED FABRICATED PARTS TO RH LEADING EDGE 611.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RIGHT LEADING EDGE WAS DEEPLY GOUGED BETWEEN RIBS 1 & 2. APPROXIMATELY 4 INCHES ABOVE LANDING LIGHT CUT-OUT. INSTALLED FABRICATED PARTS TO RH LEADING EDGE 611.