What was found
CRACK FOUND RH FRAME 25 AT JOINTING OF FLOOR STRUCTURE (RH SILL #1) IN CF2. DAMAGE SECTION OF RH FRAME 25 CUT BTW STR 16R-17R SPLICED U-SHAPE FABRICATED. RH FRAME 25 BTW 15R-17R IN CF II REPAIRED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CRACK FOUND RH FRAME 25 AT JOINTING OF FLOOR STRUCTURE (RH SILL #1) IN CF2. DAMAGE SECTION OF RH FRAME 25 CUT BTW STR 16R-17R SPLICED U-SHAPE FABRICATED. RH FRAME 25 BTW 15R-17R IN CF II REPAIRED.