What was found
AT CF1 FLOOR STRUCTURE AREA, CORROSION FOUND ON R/H SILL BTW FR 19-20. FLOOR STRUCTURE AREA, ON R/H SILL BTW FR19-20 LAYOUR PERFORMED AND DOUBLE REPAIR PART FABRICATED. AT CF1 FLOOR STRUCTURE AREA, ON R/H SILL BTW FR19-20 CUT-OUT PERFORMED AND DOUBLE REPAIR PART FULLY DRILLED, AT CF1 FLOOR STRUCTURE AREA ON R/H SILL BTW FR19-20 REPAIR PERFORMED.